Midway through this unit block upgrade, a number of existing cracks in the brickwork were discovered.
Sections of render were removed to fully expose the area at fault, be it poor brickwork or areas requiring the addition of new control joints to allow movement. Once the repairs were carried out the area was finished in conjunction with the other works to give a seamless look.